Zinc Die Casting Valve Parts are a metal forming process in which molten zinc metal is put under pressure and injected into a die.
Zinc are alloys that have high strength and hardness, outstanding corrosion resistance,full recyclability, mechanical properties, high thermal and electrical conductivity and strength at high temperatures. Zinc alloys possess high dimensional stability for complex shapes and excellent thin walls. The cost of raw material is low.
Zinc Die Casting Valve Parts Zinc Valve Parts, Zinc Die Casting of Valve Parts, Zinc Casting Parts, Zinc Casting of Valve Parts, Zinc Casting of CNC Machining NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY , https://www.bldiecasting.com
PRODUCT DESCRIPTION
This machine is specially used for producing longitudinal welded pipe in metallurgical, construction, transportation, machinery and vehicle engineering industries. With strip steel as the raw material, through cold roll forming and high frequency welding techniques, it produces round pipes and square pipes with required sizes. By making the best of the similar products home and abroad and integrating with our company's years'Â practical experiences, we improved and upgraded the machine and came up with its latest generation. In particular, the advanced technologies namely roll pass design, computer saw PLC automatic control tracking system, UK European continent full digital servo system enable the machine to realize high efficiency, low fault rate, convenience of operation and maintenance, thereby saving investment, both economical and practical, and is equivalent of advanced pipe making machine abroad.
SPECIFICATIONS
GENERAL PROCESS
Double head uncoiler → Shear & butt welder → Accumulator → Forming section(flattening unit+mani driving unit+forming unit+guide unit) → High frequency welding unit+ squeeze roller → De-burr frame → Cooling unit → Sizing unit and straightener → Flying saw under computer control → Run out table
MAIN COMPONENTS:
1 Uncoiler
2 Accumulator
3 Shearing and butt welding machine
4 Forming machine
5 Roller System of Forming
6 Seam Guide
7 High Frequency Induction Welding Machine
8 Roller System for Moving
9 Burr Removing Frame(Inside and outside)
10 Water cooling system
11 Sizing machine
12 Roller System of Leveling
13 Speed Testing Wheel
14 Turkish Frame
15 Auto flying saw controlled by Computer
16 Run-out table
17 Electric control Equipment
18 High frequency welding machine
PACKAGE AND SHIPPING
1 Container:1*40GP
2.Port:Tianjin Port
3.Package:According to the inter national martime standards
Large machine:
1).Use steel wire ang wood to fix the large machines.
2).Use shockproof film to protect the external motor.
Middle machine:
Use wooden box,waterproof and shockproof film to pack the machines.
SERVICES
Pre-sale service
1). Offer honest and objective investment consultancy suggestion based on our many years engineering experience in the steel pipe industry.Â
2). Provide planning and implementation suggestion of plants for factory long-term and consistent development.Â
3). Share our analysis and forecast with clients the global trends of steel industry, especially the market in China.Â
4). Clients are welcome to visit the production line of steel pipe at our factory and our cooperated domestic customer factories.Â
After-sale service
Â
Â
We have professionally produced Zinc Die Casting Valve Parts nearly 7 years. The parts have a great property of high quality, high precision, reasonable competetive price. our products are very popular.
Gh28b High-Frequency Steel Pipe Tube Mill
1).After the equipment arrives at the assembly field, the technicians from supplier will help direct the construction and debugging.
2).Guarantee period is one year after installation and final acceptance or 15 months after delivery date, whatever occurs first.
3).Within guarantee period, supplier is responsible for solving anomalies of the equipment,which is in the conditions of correct operation and response time shall be less than 48hours (irresistible factors are excluded). Human damaged and vulnerable parts are excluded from guarantee.
4).If the equipment are out of work one year after acceptance within the operating time, the supplier will only charge maintenance cost which include travel expenses of our repairman, cost of changing spare parts, etc.